Project Completion

Featured Projects

The Project

The Western Australian division of Fredon was recently contracted by Vaughan Constructions to complete the electrical works to the new facility for K&S Freighters in High Wycombe. Ledtec was engaged to deliver the lighting components of this D&C which included the lighting engineering and design to achieve the required lux levels to the site and the supply and installation of our exclusive LED lighting solutions.

The purpose of this new facility was to consolidate K&S’s operation and business units in one space, streamline processes and boost their operating efficiency. The following LED fixtures from our range were installed that will go a long way to maximise this efficiency at K&S’s new state-of-the-art operational facility for many years to come.

Products Installed

Our Gallery

Scroll to Top
shutterstock 388224004 1

Join Our Mailing List